Projects

Biotronik

Installation of Chilled Water Pipe System (Primary and Secondary System)

Installation of Condenser Water Pipe System

Installation of Process Cooling Water System

Installation of piping for Dry Coil Unit and Fan Coil Unit.

Assembly of Air-Handling Unit (AHU) and installation of piping.