Projects

Silicon Box

Installation of Chilled Water Pipe System (Medium Temperature & Low Temperature).

Installation of Condenser Water Pipe System

Installation of Process Cooling Water Pipe System

Installation of piping for MakeUp Air Unit (MAU) and Dry Coil unit.

Pressure Test and Chemical Flushing for Chilled Water System, Condenser Water System and Process Cooling Water System.